Broker disaster recovery planning

Connect RPO and RTO objectives to dependencies, recovery drills and return-to-service criteria.

System recovery sequence

The decision here is when and in what order operations return. An available backup is one dependency rather than the whole plan. Identify acceptance gates and reopening authority for each service.

Open the next document
01 / PROJECT

Separate objectives

RPO describes acceptable data loss; RTO describes the target recovery time. Agree both per system and scenario. There are no universal guarantees here: results depend on contracted infrastructure, dependencies and documented drills.

02 / PROJECT

Recovery order

Document identity, database, platform, CRM and payment dependencies. Define an order that avoids opening access before consistent permissions and data are recovered. Identify operations that can run in limited mode and those that must pause until reconciliation.

03 / PROJECT

Drill and rollback

Rehearse loss of the primary environment with owners present. Measure restoration, validation, communication and the return decision. Retain evidence and unresolved failures. Define rollback if the recovered environment fails project tests.

04 / PROJECT

Controlled return

Check balances, accounts, pending events and connections before reopening. Assign authority to accept exceptions and communicate known limitations. After the incident, update procedures and verify that the recovered operation produces useful backups and alerts.